Globuild

Upgrading of National Road 6 (Dar Essakah – Sidi Allal Bahraoui)

Road Infrastructures

Upgrading of the RN6 between the Dar Essakah interchange and Sidi Allal Bahraoui, including an interchange at the RP4039 intersection and 2x3 widening.

The project consists of upgrading the National Road 6 (section between the Dar Essakah interchange and Sidi Allal Bahraoui), including road works, sanitation, drainage, construction of an interchange at the intersection with the RP4039 (Sidi Chafi), widening of the RN6 to 2×3 lanes over 1.1 km, a post-tensioned slab bridge, and coordination with various concessionaires.

Our Mission :

Our engineering firm GLOBUILD provided project management and works supervision services, including:

  • Controlling work compliance with plans and the Special Specifications (CPS).
  • Technical and qualitative supervision of road and sanitation works.
  • Coordination between contractors, the client, and concessionaires (REDAL, ONEP, telecom operators, etc.).
  • Testing of materials, laboratory tests, and execution procedures.
  • Preparing minutes, meeting reports, and progress updates.
  • Technical assistance until the final handover of the works.
Information

Client: CID for the Provincial Directorate of Equipment of Rabat

Year: 2023-2025

Budget: 800 000 MAD

Category: Road Infrastructures

Back to projects
They Trust Us

Our References